Construction waste removal in Tallinn
Renovation waste piles up fast and gets in the way. We carry construction waste out, sort it and take it away, as a one-off job or regularly throughout the renovation.
from30 €/m³exact price before work starts
- In business since 2004
- Price agreed before work starts
- Invoices for companies
- Quotes in English on WhatsApp and email


Our work: real photosWhat's included
- Carrying waste from the apartment or house to the van
- Strong bags and big bags if needed
- Sorting: stone and concrete, wood, metal, mixed waste
- Transport to a licensed waste handler
- Sweeping the stairwell and loading area
- A regular schedule for building sites on request
What counts as construction waste
Construction waste is everything that comes out of renovation and demolition: plasterboard, broken tiles, concrete and plaster, bricks, wood, skirting boards, old windows and doors, insulation, film and packaging.
Estonian law requires construction waste to be collected by type. Mineral waste, wood, metal and the rest go to different places, and mixed waste costs noticeably more to hand in. That is why we recommend separate bags or piles on site, or leaving the sorting to us.
Some construction waste is hazardous. Asbestos cement sheeting (eterniit), paint and solvent residues, old fluorescent tubes and bitumen have to be collected separately. Tell us in advance if they are in the mix.
Bags, a big bag or a skip
For a smaller renovation, ordinary rubble bags are enough. We fill them and carry them out ourselves.
For a bigger renovation a big bag works well: it holds one cubic metre of waste, stays on site, you fill it at your own pace and we take it away when it is full.
If a lot of waste is produced over a longer time, for example when renovating a house, it makes sense to order a skip. We help you choose the cheapest option for your volume.
For contractors and private customers
For construction companies we offer regular removal on a schedule, for example once a week or whenever the bags are full. That way your tradespeople do not lose time carrying rubbish.
Private customers can book a one-off removal at the end of the renovation. We carry everything out of the apartment, sweep the stairwell and take the waste away in one go.
The price is based on volume and weight, the floor, the lift and whether the waste is sorted. Starting prices are below.
How to keep waste on site
A few simple habits make construction waste removal faster and cheaper:
- do not overfill bags: put only half a bag of concrete or tile pieces, so it can be carried safely;
- keep plasterboard and insulation dry: wet plasterboard is several times heavier, and weight affects the price;
- do not mix household waste in: food waste and packaging go a different way;
- keep wood, metal and mineral waste apart if there is room.
In an apartment building, do not leave bags in the stairwell. It is an escape route, and waste stored there bothers neighbours and is a fire safety problem. Keep the bags in the apartment and call us when there are enough for one load.
Prices
- Construction waste removal by vanfrom 30 €/m³
- Construction waste removal by truckfrom 30 €/m³
- Big bag with removal (1 m³)from 60 €/bag
- Carrying waste down the stairsfrom 25 €/h
Prices are indicative and exclude VAT. We confirm the exact price before work starts.
Frequently asked questions
Do you bag the waste as well?+
Yes, we bag loose waste ourselves. If it is already bagged, the job goes faster and the price is lower.
Do you take asbestos cement sheeting?+
Yes, packed separately. It is hazardous waste and goes to a different place from ordinary construction waste, so it is priced separately.
Can I leave the waste in a pile outside?+
On a private plot yes, in an apartment building courtyard usually not without the housing association's permission. It is better to agree a pick-up time so the waste does not have to stand outside.
Do you give a waste transfer document?+
Yes, on request we give companies and building sites a document showing where the waste was handed over.