Skip to content
VIRGOBALT

Apartment strip-out before renovation in Tallinn

If a full renovation is ahead, we empty and strip out the apartment to the agreed extent with one crew. Your renovation team can start with a clean slate.

from25 €/m² floor areaexact price before work starts

  • In business since 2004
  • Price agreed before work starts
  • Invoices for companies
  • Quotes in English on WhatsApp and email
Bathroom after tile removal: bare walls, pipes keptHallway after removing the door and floor coveringPlasterboard wall debris on its way to the waste stationOur work: real photos
BEFOREAFTER
Old apartment → a bare shell ready for renovation← drag →

What's included

  • Site visit and a room-by-room demolition plan
  • Removing kitchen units, doors and built-in cabinets
  • Bathroom and toilet demolition
  • Removing floor coverings and skirting boards
  • Removing wallpaper, ceiling and wall panels
  • Demolishing non-load-bearing partition walls
  • Sorting, waste removal and a final sweep

Full or selective strip-out

Apartment demolition can mean very different amounts of work. Some customers only want the kitchen and bathroom removed, others want the apartment taken back to the concrete for a completely new layout.

That is why before the job we walk through every room together and write down what stays: for example windows, radiators, door frames or the electrical panel. This list is part of the quote and protects both sides from misunderstandings.

If there is still furniture or personal belongings in the apartment, we can take them away before the demolition. That way you do not need to arrange a separate clearance and a separate demolition. See apartment clearance.

Order of work and the housing association

We usually work from top to bottom: first ceilings and wall coverings, then furniture and sanitary ware, floors last. That way debris does not fall onto surfaces already cleared.

For the housing association it matters that the stairwell stays clean and work happens at permitted times. We cover the lift walls and stairs, carry waste out in closed bags and sweep the stairwell at the end of each day.

If the building has its own rules, such as booking the lift or a ban on storing waste in the courtyard, let us know. We take them into account when planning the timetable.

Timetable and price

A full strip-out of a two-room apartment usually takes two to four working days, depending on the wall and floor materials. We put the exact timetable in the quote.

The price is based on the floor area and how deep the demolition goes. The floor and lift also matter, because one apartment can produce several loads of waste, as does parking in front of the building.

For larger jobs, demolition together with removal is usually cheaper than ordering the work separately. Indicative prices are below.

What the owner can prepare

Good preparation shortens the work and avoids pauses. Before the first day:

  • inform the housing association and neighbours of the dates and duration, ideally with a notice in the stairwell;
  • book the lift if your building requires it;
  • think about parking: if there is paid parking or a no-parking zone in front of the building, tell us;
  • remove valuable and fragile items, including light fittings you want to keep;
  • mark everything that stays: the simplest way is a sticker on the radiator, door or cabinet.

If several tradespeople will work in the apartment after us, it is worth agreeing the timetable before the demolition. Then we know which room to do first, so for example the electrician can start on the second day while the other rooms are still in progress. If you want to keep old items such as internal doors, parquet or lights, say so and we will remove them carefully.

Prices

  • Full apartment strip-outfrom 25 €/m² floor area
  • Single room strip-outfrom 400 €/room
  • Kitchen unit removalfrom 120 €/kitchen
  • Demolition worker, hourly ratefrom 40 €/h
  • Waste removalfrom 30 €/m³

Prices are indicative and exclude VAT. We confirm the exact price before work starts.

Frequently asked questions

Can you empty the apartment before the demolition?+

Yes. Removing old furniture and belongings can be part of the same job, before the demolition starts.

Do you need keys to the apartment?+

For a job of several days it is more convenient. We agree the handover and return of the keys in writing.

What about radiators and pipes?+

In apartment buildings, heating system parts are often the housing association's responsibility. We remove radiators only by agreement and after the system has been drained.

Do you work at weekends?+

Noisy work is usually done on weekdays, as most associations require. Quieter work and waste removal can be done on Saturdays by arrangement.

Do you leave the apartment clean for renovation?+

Yes, at the end we sweep all rooms and the stairwell. It is not a full construction clean, but the renovation team can start straight away.

Get a quote: apartment strip-out

Add a couple of photos so we can quote without a site visit.

Call WhatsApp